Open RFP

Mosquito Lake Control Tower Roof Replacement

Description: Replacement of the standing seam metal roof on the control tower building. The work includes rerouting existing vent and exhaust pipes through the masonry side wall, installing a new gutter system, and integrating a new, certified, non-penetrating Lightning Protection System. The work includes, but is not limited to, the following major components: Demolition and Disposal: Remove and legally dispose of the existing standing seam metal roof panel system, box gutter, scuppers, and lightning protection system down to the concrete roof slab. See attached file.

Released
Aug 19, 2026
Closes
Oct 26, 2026(18 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts