CityCT
Posted
Nov 3, 2026
Nov 30, 2026
Construction of Train Station Area Pedestrian Accessibility Improvements RFP
Construction of train station area pedestrian accessibility improvements.
Description: 194 SF Concrete Sidewalk Grinding (1/2" to 1"); 141 SF Concrete Sidewalk Grinding (>1" to 2"); 36 SY Concrete Sidewalk, 5" Thick, French Gray; 60 SY Concrete Sidewalk, 7" Thick, French Gray; 422 SY Reset Bluestone Sidewalk; 6 SY Detectable Warning Surface (Embed)(If and Where Directed); 2 SY Detectable Warning Surface (Surface Mount) (If and Where Directed); 115 LF of 9" x 20" Concrete Vertical Curb, French Gray;177 SY Topsoiling, Screened Topsoil, 4" Thick (If and Where Directed); 177 SY Fertilizing & Seeding, Type A‐3 (If and Where Directed); 177 SY Straw Mulching (If and Where Directed); and 92 SY Wood Mulching, 4" Thick, Cedar (If and Where Directed).
City · NJ, US
These related opportunities are still open for bidding.
CityCT
Posted
Nov 3, 2026
Nov 30, 2026
Construction of train station area pedestrian accessibility improvements.
CityTX
Posted
Nov 9, 2026
Dec 1, 2026
Installation of approximately six blocks of 4-inch (4") and 6-inch (6") concrete sidewalk with decorative brick finishes, curb and gutter, ADA accessible ramps, handrails, light pole foundations and all associated appurtenances.
Washington State Department of Transportation
State AgencyWA
Posted
Nov 3, 2026
Nov 24, 2026
Construction of Moxee Avenue sidewalk improvements, including removal of mature trees and damaged sidewalk, replacement with new sidewalk, and construction of tree wells.
CountyIN
Posted
-
Nov 24, 2026
The work under these specifications requires the contractor to furnish all labor, materials, equipment, appurtenances, licenses, tools, and transportation necessary to complete sidewalk construction improvements. Key work items include construction engineering, mobilization and demobilization, clearing of right-of-way, pavement removal, pipe removal, excavation, borrow, stormwater management implementation, subgrade treatment, structure backfill, geogrid, aggregate placement, HMA patching, metal fence rail, concrete sidewalk construction, curb ramps, detectable warning surfaces, PCCP for approaches, riprap, geotextile, erosion control, mulched seeding, topsoil, sodding, 242 LF of 12" drainage pipe installation and extensions, pipe end sections, manholes, construction signage, traffic maintenance, relocated sign assemblies, thermoplastic transverse pavement markings, and potholing.
Decision makers connected to this RFP from Town of Morristown.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval