Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of Digester Building and Odor Ducts Removal and Capping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of the removal of the district's current digester no. 1 cover and replacing it with a new digester cover. This includes removal and re-installation of the existing linear motion mixing equipment, and the replacement of the drive for the mixing equipment. The project includes emptying and cleaning of digester no. 1. The project will also consist of associated site work, structural, building components, electrical work, instrumentation and controls as specified herein.
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
Project consists of the removal of the district's current digester no. 1 cover and replacing it with a new digester cover. This includes removal and re-installation of the existing linear motion mixing equipment, and the replacement of the drive for the mixing equipment. The project includes emptying and cleaning of digester no. 1. The project will also consist of associated site work, structural, building components, electrical work, instrumentation and controls as specified herein.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Dec 17, 2025
Close: Dec 30, 2025
Purchase and removal of a metal building.
AvailableRemoval of the existing annular gas seal between the lid and the wall of Digester 5 and supply, installation and testing of a new annular gas seal.
Posted Date
Mar 20, 2025
Due Date
Jan 21, 2026
Release: Mar 20, 2025
Close: Jan 21, 2026
Removal of the existing annular gas seal between the lid and the wall of Digester 5 and supply, installation and testing of a new annular gas seal.
AvailableThe Patrick Leahy Burlington International Airport seeks proposals for constructing a 43,000 sq ft pre-engineered metal building for snow removal equipment, including parking for 23 vehicles, office spaces, a fuel island, and a material storage building. The project requires compliance with federal and state wage rates, bonding, insurance, and DBE participation. Bidders must be pre-qualified with the City of Burlington.
Posted Date
-
Due Date
Dec 30, 2025
Release: -
Close: Dec 30, 2025
The Patrick Leahy Burlington International Airport seeks proposals for constructing a 43,000 sq ft pre-engineered metal building for snow removal equipment, including parking for 23 vehicles, office spaces, a fuel island, and a material storage building. The project requires compliance with federal and state wage rates, bonding, insurance, and DBE participation. Bidders must be pre-qualified with the City of Burlington.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →