Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the removal of the district's current digester no. 1 cover and replacing it with a new digester cover. This includes removal and re-installation of the existing linear motion mixing equipment, and the replacement of the drive for the mixing equipment. The project includes emptying and cleaning of digester no. 1. The project will also consist of associated site work, structural, building components, electrical work, instrumentation and controls as specified herein.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Proposals are solicited for re-coating Primary Digester #1 and Secondary #2 Metal Cover (Interior, Exterior), Exposed Concrete, Exposed Digester Piping and Appurtenances.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Proposals are solicited for re-coating Primary Digester #1 and Secondary #2 Metal Cover (Interior, Exterior), Exposed Concrete, Exposed Digester Piping and Appurtenances.
AvailableWork includes re-coating primary digester #1 and secondary digester #2 metal covers (interior, exterior), digester piping and appurtenances, repair and coat exposed concrete on the two digester tanks.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Work includes re-coating primary digester #1 and secondary digester #2 metal covers (interior, exterior), digester piping and appurtenances, repair and coat exposed concrete on the two digester tanks.
AvailableThe project consists of the staged removal and replacement of three boilers serving the District's anaerobic digesters, including installation of a lead/lag system and connection to SCADA. Only one boiler may be out of service at a time.
Posted Date
Dec 9, 2025
Due Date
Feb 5, 2026
Release: Dec 9, 2025
Close: Feb 5, 2026
The project consists of the staged removal and replacement of three boilers serving the District's anaerobic digesters, including installation of a lead/lag system and connection to SCADA. Only one boiler may be out of service at a time.
AvailableThe City of Richland, Washington is soliciting Statements of Qualifications from professional engineering firms to provide engineering design, bid-ready documents, and contract specifications for replacement and rehabilitation of the City’s wastewater treatment plant anaerobic digesters with steel gas holder covers. The procurement is posted and administered on the City’s official PublicPurchase portal. Submittals are due on February 10, 2026 at 3:00 p.m. Pacific Time.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
The City of Richland, Washington is soliciting Statements of Qualifications from professional engineering firms to provide engineering design, bid-ready documents, and contract specifications for replacement and rehabilitation of the City’s wastewater treatment plant anaerobic digesters with steel gas holder covers. The procurement is posted and administered on the City’s official PublicPurchase portal. Submittals are due on February 10, 2026 at 3:00 p.m. Pacific Time.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →