Aug 4, 2026
Closes
Sep 21, 2026
Construction of Heat Exchangers, Ogden and Damen Building (Request for Quotes) Chicago
Construction of heat exchangers.
Description: To complete project 537-24-101 modernize the damen elevators 1 through 8 as well as the morgue elevator work includes general construction and alterations to modernize existing elevators p1, p2, p3, p4, s5, s6, p7, p8, and m1 in building 1a, including alterations to associated partitions and finishes where new corridor devices are installed; new sump pumps in elevator pits; and upgrades to associated mechanical, electrical, and communications systems.
Federal · WI, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
Aug 4, 2026
Closes
Sep 21, 2026
Construction of heat exchangers.
Louisiana Department of Veterans Affairs
State AgencyLA
Aug 18, 2026
Closes
Sep 2, 2026
The Department of Veterans Affairs issued this active presolicitation for the Modernize 6N Inpatient Restrooms (Swing for 3N) project at the 6N ICU in Shreveport, Louisiana. The work requires replacing ten inpatient restroom Patient Care Unit assemblies, including combination swivette toilet, sink, and cabinet units, with VA-approved fixed toilet-sink-cabinet assemblies comparable to or better than those on the 3N ICU, while maintaining safe access and continuous operation. The posting lists an Original Published Date of Aug 18, 2026 08:58 am CDT and an Original Response Date of Sep 02, 2026 02:00 pm CDT, with phased work potentially occurring after hours or on weekends and a 180-calendar-day performance period from the Notice to Proceed.
Aug 18, 2026
Closes
Sep 2, 2026
The project requires replacing ten inpatient restroom Patient Care Units (PCUs) in the 6N ICU—currently equipped with combination swivette toilet, sink, and cabinet units—with VA-approved fixed toilet-sink-cabinet assemblies comparable to or better than the existing units on the 3N ICU.
CityIN
Aug 17, 2026
Closes
Sep 3, 2026
Work inlcudes modernize existing traffic signals.