Reedy Creek Improvement District
Special DistrictFL
Posted
-
Oct 5, 2026
Lift Station #46 Rehabilitation
Work inlcudes lift station #46 rehabilitation, discharge piping: replace existing discharge piping and risers, wet well rehabilitation: clean, repair, reline, and coat the wet well as required, pumps: remove and replace the existing pumps, pump discharge connections: replace pump base elbows and associated 90-degree fittings, emergency pumping: install a new diesel-powered emergency pump, controls, and associated piping, including removal of the existing generator and associated controls, valves and above-grade piping: replace existing check valves and plug valves, including associated piping, and relocate piping above grade. See outside link.