Lift Station No. 2 Rehabilitation
The work is described in general, non-inclusive below: 1. Civil Components: Elevation of wet well and valve vault, grading, vegetation removal, sodding, fence and gate removal and reinstallation, and site restoration. 2. Mechanical Components: Removal and replacement of the gate valves, check valves, and pump out connection within the existing valve vault. Installation of pipe supports. Removal and replacement of the pump guide rails to accommodate the new wet well height. Installation of new access hatches with fall protection. Contractor shall provide bypassing pumping system required for rehabilitation of lift station. 3. Electrical Components: Removal and replacement of the Lift Station control panel. Contractor to provide new termination boxes, equipment racks, grounding, and installation of new level floats.