Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking sealed bids for two modular. Modular #1 - Is described as a 2007, modular, equipped with two classrooms and two bathrooms, the dimensions are 24 x 72, and it is white and brown in color. There will be a $1,000 minimum bid. Modular #2 - Is described as a 2012, modular, equipped with two classrooms and two bathrooms, the dimensions are 27 x 72, and it is white and blue in color. There will be a $2,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of (3) 24' x 40' modular classroom buildings elementary school.
Posted Date
Jan 18, 2026
Due Date
Feb 26, 2026
Release: Jan 18, 2026
Close: Feb 26, 2026
Construction of (3) 24' x 40' modular classroom buildings elementary school.
AvailableWork consists of modular expansion project - purchase of two (2) new dsa approved 24' x 40' modular classrooms.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close: Feb 19, 2026
Work consists of modular expansion project - purchase of two (2) new dsa approved 24' x 40' modular classrooms.
AvailableConstruction of new modular classroom buildings with associated site work and ada improvements. Construction of a wood framed building, concrete slab alteration, hollow metal doors & frames. The interior building components include electrical, data, fire alarm, hvac, air balance, plumbing, drywall, insulation, frp, paint, casework and countertops, acoustical t-bar ceilings, & lvp flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, playground structures, shade structures, rubberized surface materials, septic tank installation, retention systems, site concrete, modular concrete foundations, electrical infrastructure.
Posted Date
Jan 10, 2026
Due Date
Feb 2, 2026
Release: Jan 10, 2026
Close: Feb 2, 2026
Work includes removing two buildings, one gazebo, and one and the hauling/disposal of the debris appropriately. All components of the septic system on the property will be removed completely as part of this project. Slabs and raised foundations will be removed fully, as well as sidewalks, stairs, and ramps. Contractor shall remove all shrubbery and trees directly around both buildings and gazebo identified by the cor. Contractor shall remove 14' x 8' shed and chain link fence located on south side of site. See attached file.
Posted Date
Jan 13, 2026
Due Date
Feb 12, 2026
Release: Jan 13, 2026
Close: Feb 12, 2026
Work includes removing two buildings, one gazebo, and one and the hauling/disposal of the debris appropriately. All components of the septic system on the property will be removed completely as part of this project. Slabs and raised foundations will be removed fully, as well as sidewalks, stairs, and ramps. Contractor shall remove all shrubbery and trees directly around both buildings and gazebo identified by the cor. Contractor shall remove 14' x 8' shed and chain link fence located on south side of site. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Construction of new modular classroom buildings with associated site work and ada improvements. Construction of a wood framed building, concrete slab alteration, hollow metal doors & frames. The interior building components include electrical, data, fire alarm, hvac, air balance, plumbing, drywall, insulation, frp, paint, casework and countertops, acoustical t-bar ceilings, & lvp flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, playground structures, shade structures, rubberized surface materials, septic tank installation, retention systems, site concrete, modular concrete foundations, electrical infrastructure.