CityVT
Posted
Aug 12, 2026
Oct 1, 2026
Clarifiers Rehabilitation Project *RE-BID*
The contract generally includes the following work items at the Water Resource Recovery Facility located at 35 Cascade Street in the City of Essex Junction: Primary Clarifier #1 • All steel in immersion including walls, rake arms and any miscellaneous piping. This does not include the steel-effluent channels. • Concrete Floors in immersion including grout injection to stop water infiltration, resurfacing, and lining. ADD ALTERNATE A • Add all atmospheric steel on Primary Clarifier #1. See Specification Section (2.02.B.) Secondary Clarifier #1 • All steel in immersion including drum, rake arms and any miscellaneous piping.