CityMA
Posted
Dec 8, 2025
Dec 4, 2026
IFB - Mildred Hailey MassWorks Subphase 2 - United Street (RE-BID)
Project consists of massworks.
Description: The City of Boston Planning Department, on behalf of the Boston Redevelopment Authority ("BRA") d/b/a Boston Planning & Development Agency ("BPDA"), is pleased to issue this Invitation for Bids ("IFB") to perform construction services for "Mildred Hailey MassWorks Subphase 2 -- United Street". The IFB is issued in accordance with M.G.L. c. 149, as may be amended. All bids for this project are subject to all applicable provisions of law and in accordance with the terms and provisions of the contract documents entitled: Mildred Hailey MassWorks Subphase 2 -- United Street. Bids must be submitted before 10:00 AM., Boston time, Friday, December 4, 2026, and opened forthwith. The IFB documents will be available on or about Monday, November 16, 2026, after 10:00 A.M., Boston time. Electronic plans and documents are available upon contacting Frederick Berry of Nitsch Engineering at fberry@nitscheng.com on Monday November 16, 2026, after 10:00 AM with your name, phone number, email address and company address at which time, Nitsch Engineering will provide an electronic link to the Plans and documents All responses to this IFB must be returned no later before 10:00AM on Friday, December 4, 2026, to: Office of the Civil Engineer, Nitsch Engineering, Inc. at 2 Center Plaza, Suite 430, Boston, MA 02108. Kairos Shen, Director of Planning
City · MA, US
Adjacent opportunities open for bidding right now.
CityMA
Posted
Dec 8, 2025
Dec 4, 2026
Project consists of massworks.
CityTX
Posted
Nov 5, 2026
Nov 24, 2026
The full-depth reconstruction of approximately 1,600 linear feet of existing roadway, beginning at its intersection with Judge Ely Boulevard and extending westward along Hailey Street. Improvements include the removal and disposal of existing hot mix asphalt pavement, roadway base material, and concrete curb and gutter, followed by preparation and lime stabilization of the underlying subgrade. The proposed roadway section will consist of 7 inches of flexible base material, new concrete curb and gutter, and hot mix asphalt pavement in accordance with the construction plans and specifications. Construction activities shall include necessary grading, compaction, and adjustments to existing improvements to accommodate the proposed roadway elevations and drainage patterns. The Contractor shall coordinate construction sequencing and maintain reasonable access to adjacent properties throughout the project, minimizing disruptions to existing property owners to the extent practical. The project will also require coordination with AEP Texas for overhead electrical utility pole adjustments or relocations, with such utility work to be performed by AEP Texas. The Contractor shall coordinate its construction schedule with the required utility work to minimize conflicts and facilitate timely completion of the roadway improvements.
CityOH
Posted
Nov 7, 2026
Nov 24, 2026
Work include reconstruction of south street from main to sycamore street, including replacement of asphalt, curb, sidewalk, storm sewer, and water.
CityCA
Posted
Oct 28, 2026
Nov 19, 2026
Work consists of installing 15-gallon trees and 1- and 5-gallon shrubs. Within existing city-maintained street medians. The project also includes replacing damaged concrete median curbs, repairing and adjusting irrigation systems to meet city standards, installing lighting at all five city-maintained monument sign locations, and replenishing mulch. The contract includes a 1-year maintenance period for all newly planted trees and shrubs to promote proper growth, health, and long-term establishment.
Decision makers connected to this RFP from City of Boston.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval