Summary
The City of Fresno is soliciting bids for the Midtown Fresno Trail: Herndon Canal Metro Trail from Shields to McKinley (Midtown Trail Segment 3), a 1.35-mile pedestrian and bicycle trail that is part of a 7.1-mile Metropolitan Trails System. Work includes minor roadway and crossing improvements, installation of a City-furnished prefabricated pedestrian bridge, ADA ramp upgrades, and amenities such as benches, lighting, drinking fountains, bicycle racks, dog waste stations, signage, striping, landscaping, and irrigation; coordination with Fresno Irrigation District, County of Fresno, the San Joaquin Valley Air Pollution Control District, and PG&E will be required. The solicitation was posted 2026-06-19, requires a valid California Class A contractor license and bonds (10% bid bond; 100% payment and performance bonds), has a bid due date of 2026-07-21, and specifies 120 working days after Notice to Proceed with liquidated damages of $5,000 per calendar day of delay.