CityNJ
Posted
Sep 14, 2026
Sep 29, 2026
GAC Filter Pole Barn Installation
Prepare NJPE Signed & Sealed Building Plans for a 25'-6" x 40' x 25' Eave Height Pole Barn to enclose new Filter Vessels & equipment Prepare and submit shop drawings of all materials including OHDs & motors. Delivery and unloading of all MATERIALS including appurtenances Furnish all labor, equipment & materials to build Pole Barn, with doors, motors, insulation, roofing, interior metal walls & ceiling & gutters with downspouts. Furnish & install (2) 10'x10' Overhead Doors with motors (electrical by Owner) Furnish & Install (1) 6'x8' Aluminum Roll-up Door. Attendance at two project meetings on-site with Owner's Electrician for full cooperation & timing of electrical install by Owner's Electrician.