Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Works include approx. 129 CY Excavate and dispose of soils; 190 SF 4" Concrete Walk; 700 SF Standard Gravel Shoulder; 15 CY Hardwood Mulch. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking proposals from qualified consultants to provide services for the identification, prioritization, planning, conceptual design, design development, preparation of construction documents, and construction phase engineering support for green stormwater infrastructure (gsi) in the urban environment including streets, parks and recreation properties, parking lots, vacant land, and other locations identified by the department.
Posted Date
Jan 9, 2026
Due Date
Feb 23, 2026
Release: Jan 9, 2026
Close: Feb 23, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals from qualified consultants to provide services for the identification, prioritization, planning, conceptual design, design development, preparation of construction documents, and construction phase engineering support for green stormwater infrastructure (gsi) in the urban environment including streets, parks and recreation properties, parking lots, vacant land, and other locations identified by the department.
Provision of qualified firms for specialized landscape and other maintenance services for green stormwater infrastructure (GSI) assets.
Posted Date
Apr 10, 2025
Due Date
Apr 10, 2030
Release: Apr 10, 2025
Close: Apr 10, 2030
Provision of qualified firms for specialized landscape and other maintenance services for green stormwater infrastructure (GSI) assets.
AvailableConstruction of green stormwater infrastructure (GI) improvements.
Posted Date
Jan 9, 2026
Due Date
Feb 9, 2026
Release: Jan 9, 2026
Close: Feb 9, 2026
Construction of green stormwater infrastructure (GI) improvements.
AvailableWork includes grading, erosion control, vegetation establishment, installation of SCM cleanouts, check dams, impermeable liners, and drainage structures; concrete and asphalt paving; curb, gutter, and stamped concrete; and foundations for metal pole
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Work includes grading, erosion control, vegetation establishment, installation of SCM cleanouts, check dams, impermeable liners, and drainage structures; concrete and asphalt paving; curb, gutter, and stamped concrete; and foundations for metal pole
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →