Madison Metropolitan Sewer District
Special DistrictWI
Posted
Oct 22, 2026
Nov 12, 2026
2026 MMSD Utility Line Opening (ULO) Project RFP
Procurement of utility line opening (ULO) services.
Description: Mechanical demolition of five primary and two secondary buildings at five parcels in Milwaukee, Wisconsin.
City · WI, US
Adjacent opportunities open for bidding right now.
Madison Metropolitan Sewer District
Special DistrictWI
Posted
Oct 22, 2026
Nov 12, 2026
Procurement of utility line opening (ULO) services.
School DistrictWV
Posted
Oct 9, 2026
Nov 9, 2026
Work shall include, but not be limited to the following: Abatement and demolition of the Elementary School building and prepare the site for future development.
CityWY
Posted
Oct 13, 2026
Nov 10, 2026
Project is to complete regulated full demolition of the structure, followed by proper disposal of all asbestos-containing materials (ACM), lead-paint and other regulated demolition debris.
CityGA
Posted
Sep 28, 2026
Oct 29, 2026
Work includes demolition and replacement of sidewalks; extraction of memorial stamped bricks without breakage and re-installing these memorial bricks in the newly constructed sidewalks in the same location as their original placement; hauling and lawful disposal of all demolition debris; grading, compaction, and base preparation; installation and finishing of new concrete sidewalks using GDOT standards; installation of americans with disabilities act (ADA)-compliant curb ramps; installation of concrete ADA-compliant handicapped ramps as specified; installation of aluminum handrails as specified; restoration and cleanup of all disturbed areas; and traffic and pedestrian control necessary to complete the work safely.
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Milwaukee.