Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Clinton
The project includes approx 1,540 LF 42" DR 17 via directional boring; 9,605 LF 36" PVC or 42" HDPE; 440 LF 36" steel cased road bore; 11,360 LF utility marking tape; 1,540 LF tracer wire; 5,230 LF erosion control silt fence. See outside linked file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Ellisville
The City of Ellisville seeks proposals for water system improvements under the MCWI program, funded by the ARPA Mississippi Municipality and County Water Infrastructure Grant Program. The project involves compliance with specific federal and state regulations, and the award will be based on the lowest qualified bid.
Posted Date
-
Due Date
Dec 3, 2025
Release: -
City of Ellisville
Close: Dec 3, 2025
The City of Ellisville seeks proposals for water system improvements under the MCWI program, funded by the ARPA Mississippi Municipality and County Water Infrastructure Grant Program. The project involves compliance with specific federal and state regulations, and the award will be based on the lowest qualified bid.
AvailableLee County
SE force main improvements
Posted Date
Oct 31, 2025
Due Date
Dec 2, 2025
Release: Oct 31, 2025
Lee County
Close: Dec 2, 2025
SE force main improvements
AvailableTownship of North Brunswick
Rehabilitation and replacement of the Pump Station Force Main located in Park. The proposed improvements include the cured-in-place lining of approx. 200 LF of existing 14" of ductile iron pipe (D.I.P) force main and the replacement of approximately 765 LF of force main with new 14" of D.I.P Class 52 force main. The project also includes test pits, excavation of sending and receiving pits, backfill, restoration, appurtenances, and all other work in accordance with the Contract Documents.
Posted Date
Sep 17, 2025
Due Date
Nov 21, 2025
Release: Sep 17, 2025
Township of North Brunswick
Close: Nov 21, 2025
Rehabilitation and replacement of the Pump Station Force Main located in Park. The proposed improvements include the cured-in-place lining of approx. 200 LF of existing 14" of ductile iron pipe (D.I.P) force main and the replacement of approximately 765 LF of force main with new 14" of D.I.P Class 52 force main. The project also includes test pits, excavation of sending and receiving pits, backfill, restoration, appurtenances, and all other work in accordance with the Contract Documents.
Costa Mesa Sanitary District
Work consists of constructing new sewer gravity main, a new manhole, and some work. Work includes, remove and dispose of all excess or waste materials, debris, rubbish, and temporary facilities from the site, structures and all facilities; repair pavement, roads, sod, and all other areas affected by construction operations and restore them to original condition or to minimum condition specified; remove spatter, grease, stains, fingerprints, dust, labels, tags, packing materials and other foreign items or substances from interior and exterior surfaces, equipment, signs and lettering; repair, patch and touch up chipped, scratched, dented or otherwise marred surfaces to match specified finish; remove paint, clean and restore all equipment and material nameplates, labels and other identification markings; wash and shine glazing and polished surfaces; clean all floors, slabs, pavements, and ground surfaces; maintain cleaning until acceptance and occupation by the district.
Posted Date
Nov 10, 2025
Due Date
Jan 7, 2026
Release: Nov 10, 2025
Costa Mesa Sanitary District
Close: Jan 7, 2026
Work consists of constructing new sewer gravity main, a new manhole, and some work. Work includes, remove and dispose of all excess or waste materials, debris, rubbish, and temporary facilities from the site, structures and all facilities; repair pavement, roads, sod, and all other areas affected by construction operations and restore them to original condition or to minimum condition specified; remove spatter, grease, stains, fingerprints, dust, labels, tags, packing materials and other foreign items or substances from interior and exterior surfaces, equipment, signs and lettering; repair, patch and touch up chipped, scratched, dented or otherwise marred surfaces to match specified finish; remove paint, clean and restore all equipment and material nameplates, labels and other identification markings; wash and shine glazing and polished surfaces; clean all floors, slabs, pavements, and ground surfaces; maintain cleaning until acceptance and occupation by the district.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis