Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves the installation of concrete sidewalk and curb ramps, including, clearing and grubbing; miscellaneous site removals and replacements; traffic control; resident/business notification; erosion and sedimentation control measures; unclassified bulk excavation and fine grading; placement of new concrete curb sidewalk and curb ramps; existing sidewalk adjustments; manhole adjustments; existing utility and site feature protection; and site restoration, complete in place. Add Alternate No. 1 The project involves the installation of concrete sidewalk, curb ramps, and a retaining wall, including, clearing and grubbing; miscellaneous site removals and replacements; traffic control; resident/business notification; erosion and sedimentation control measures; unclassified bulk excavation and fine grading; placement of new concrete curb sidewalk and curb ramps; existing sidewalk adjustments; manhole adjustments; existing utility and site feature protection; and site restoration, complete in place.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of constructing a 5 FT concrete sidewalk, in order to eliminate the sidewalk network gap on the east side of drive. The project includes converting open section roadway to closed section roadway wherever needed, providing a 0-4' grass buffer, 5'-6' wide sidewalk, 1' bench and tie in grading, ADA compatible sidewalk ramps, drainage inlet and pipe installation/ adjustment, mill and overlay, and pavement marking.
Posted Date
Dec 15, 2025
Due Date
Jan 9, 2026
Release: Dec 15, 2025
Close: Jan 9, 2026
Project consists of constructing a 5 FT concrete sidewalk, in order to eliminate the sidewalk network gap on the east side of drive. The project includes converting open section roadway to closed section roadway wherever needed, providing a 0-4' grass buffer, 5'-6' wide sidewalk, 1' bench and tie in grading, ADA compatible sidewalk ramps, drainage inlet and pipe installation/ adjustment, mill and overlay, and pavement marking.
Sidewalk project.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Sidewalk project.
AvailableThe Parish of Caddo is soliciting sealed bids for the North Lakeshore Drive Improvement Project (IFB 26-01), classified as Highway, Street and Bridge Construction. Work includes roadway rehabilitation, milling, asphaltic concrete overlay (Superpave), patching/leveling, pavement markings, and shoulder aggregate as described in the contract documents. Bidding documents are available December 29, 2025, and bids are due January 22, 2026 at 3:00 PM CST.
Posted Date
Dec 29, 2025
Due Date
Jan 22, 2026
Release: Dec 29, 2025
Close: Jan 22, 2026
The Parish of Caddo is soliciting sealed bids for the North Lakeshore Drive Improvement Project (IFB 26-01), classified as Highway, Street and Bridge Construction. Work includes roadway rehabilitation, milling, asphaltic concrete overlay (Superpave), patching/leveling, pavement markings, and shoulder aggregate as described in the contract documents. Bidding documents are available December 29, 2025, and bids are due January 22, 2026 at 3:00 PM CST.
The project includes approximately 395 SY of concrete sidewalk, including two (2) ADA ramps.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
The project includes approximately 395 SY of concrete sidewalk, including two (2) ADA ramps.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis