Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $23,800, use sole source.
Coops: Lead with coops: Use COSTARS or Sourcewell to make a fast, compliant award.
Township of McCandless: There is no evidence of sole source awards above the competitive threshold. With a low competitive bidding threshold (~$23,800), attempts to justify sole source are unlikely to succeed.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Township of McCandless's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Public Information Officer
Social Worker (Police Department)
Town Engineer
Chief of Police
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Township of McCandless
Procurement of Town Attorney services for the Town of McCandless.
Posted Date
-
Due Date
Feb 2, 2026
Township of McCandless
Close: Feb 2, 2026
Procurement of Town Attorney services for the Town of McCandless.
AvailableTownship of McCandless
Provide and install a 150 kw, 120/208v, 3-phase, 4-wire diesel standby generator system with associated 800a service entrance equipment, automatic transfer switches, distribution upgrades, and related work.
Posted Date
Oct 2, 2025
Due Date
Nov 5, 2025
Release: Oct 2, 2025
Township of McCandless
Close: Nov 5, 2025
Provide and install a 150 kw, 120/208v, 3-phase, 4-wire diesel standby generator system with associated 800a service entrance equipment, automatic transfer switches, distribution upgrades, and related work.
Township of McCandless
The project involves the installation of concrete sidewalk and curb ramps, including, clearing and grubbing; miscellaneous site removals and replacements; traffic control; resident/business notification; erosion and sedimentation control measures; unclassified bulk excavation and fine grading; placement of new concrete curb sidewalk and curb ramps; existing sidewalk adjustments; manhole adjustments; existing utility and site feature protection; and site restoration, complete in place. Add Alternate No. 1 The project involves the installation of concrete sidewalk, curb ramps, and a retaining wall, including, clearing and grubbing; miscellaneous site removals and replacements; traffic control; resident/business notification; erosion and sedimentation control measures; unclassified bulk excavation and fine grading; placement of new concrete curb sidewalk and curb ramps; existing sidewalk adjustments; manhole adjustments; existing utility and site feature protection; and site restoration, complete in place.
Posted Date
Jul 3, 2025
Due Date
Jul 31, 2025
Release: Jul 3, 2025
Township of McCandless
Close: Jul 31, 2025
The project involves the installation of concrete sidewalk and curb ramps, including, clearing and grubbing; miscellaneous site removals and replacements; traffic control; resident/business notification; erosion and sedimentation control measures; unclassified bulk excavation and fine grading; placement of new concrete curb sidewalk and curb ramps; existing sidewalk adjustments; manhole adjustments; existing utility and site feature protection; and site restoration, complete in place. Add Alternate No. 1 The project involves the installation of concrete sidewalk, curb ramps, and a retaining wall, including, clearing and grubbing; miscellaneous site removals and replacements; traffic control; resident/business notification; erosion and sedimentation control measures; unclassified bulk excavation and fine grading; placement of new concrete curb sidewalk and curb ramps; existing sidewalk adjustments; manhole adjustments; existing utility and site feature protection; and site restoration, complete in place.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.