CityNC
Jun 23, 2026
Closes
Sep 15, 2026
Signal Mast Arm Installation *Re-Bid*
Work includes 10 TON incidental stone base (shoulder const); 2 EA pedestrian signal head (161", 1 section with countdown); 780 LF signal cable; 5 EA vehicle signal head (12", 3 sections); 50 LF unpaved trenching (1 conduit, 2"); 1 EA junction box (standard size); 1 EA 1/2" riser with weatherhead; 270 LF lead-in cable (14-2); 2 EA microwave vehicle detection system - multiple zones; 5 EA sign for signals; 4 EA temporary wooden support poles; 5 EA temporary signal heads; 8 EA microwave vehicle detection system - multiple zones; 6 EA double mast arm poles. See attached file.