Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 27 EA demolition - existing tree stump removal; 2,100 SY sidewalk / concrete curb demolition; 1,717 SY cement concrete sidewalk; 345 SY cement concrete sidewalk - decorative - bomanite (integral color); 2,000 LF plain cement concrete curb; 26 EA light fixture foundations - street lights; 12 EA light fixture foundations - bollards with lights; 1 LS existing retaining wall demolition; 1 LS redi rock retaining wall - blockhouse plaza west & south; 8 EA decorative street signs; 4 EA decorative signs (handicapped parking only); 267 SY bituminous repairs. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of E. Elm Street Transmission Main Improvements, including installation of 1,250 LF of 16-inch and 70 LF of 8-inch C900 PVC water main, valves, fire hydrant assemblies, and E. Elm Street reconstruction involving HMA, crushed surfacing, and excavation.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
Construction of E. Elm Street Transmission Main Improvements, including installation of 1,250 LF of 16-inch and 70 LF of 8-inch C900 PVC water main, valves, fire hydrant assemblies, and E. Elm Street reconstruction involving HMA, crushed surfacing, and excavation.
AvailableThe Town of West Springfield’s Department of Public Works – Water Division is soliciting sealed bids to replace a water main on Pierce Street in West Springfield, MA. A pre‑bid walkthrough is scheduled for January 20, 2026 at 9:00 AM. Bids are due and will be opened on January 30, 2026 at 2:00 PM Eastern Time.
Posted Date
Jan 5, 2026
Due Date
Jan 30, 2026
Release: Jan 5, 2026
Close: Jan 30, 2026
The Town of West Springfield’s Department of Public Works – Water Division is soliciting sealed bids to replace a water main on Pierce Street in West Springfield, MA. A pre‑bid walkthrough is scheduled for January 20, 2026 at 9:00 AM. Bids are due and will be opened on January 30, 2026 at 2:00 PM Eastern Time.
AvailableInstall 1,250 LF of 16" C900 PVC water main and 70 LF of 8" C900 PVC water main with valves and fire hydrant assemblies. Reconstruct East Elm Street including 650 tons HMA, 1,300 tons CSBC, 600 tons CSTC, and 1,200 CY unclassified excavation.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
Install 1,250 LF of 16" C900 PVC water main and 70 LF of 8" C900 PVC water main with valves and fire hydrant assemblies. Reconstruct East Elm Street including 650 tons HMA, 1,300 tons CSBC, 600 tons CSTC, and 1,200 CY unclassified excavation.
AvailableSealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis