Calhoun Charleston Utility District
Special DistrictTN
Aug 12, 2026
Closes
Sep 24, 2026
Highway 163 Waterline Extension
Work includes approx 15 CY cast-in-place concrete; 600 LF of 6" SDR 9 HDPE by directional boring method; 12,800 LF of 6" SDR17, Class 250 PVC pipe in trench; 1 EA 6" connection to an existing water line.