Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The new facility will include multiple supporting components such as raw water metering, advanced treatment and filtration systems, pump stations, chemical and ozone facilities, and an administration building. Construction will involve significant site work, underground utilities, structural concrete, mechanical and electrical systems, and specialized treatment equipment installation
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construct new water treatment plant.
Posted Date
Jan 1, 2026
Due Date
Jan 29, 2026
Release: Jan 1, 2026
Close: Jan 29, 2026
Construct new water treatment plant.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
Posted Date
Nov 13, 2025
Due Date
Jan 29, 2026
Release: Nov 13, 2025
Close: Jan 29, 2026
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
AvailableWork consists of water treatment plant intake cleaning and repairs.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Work consists of water treatment plant intake cleaning and repairs.
AvailableExamination announcement for Wastewater Treatment Plant / Water Treatment Plant Operator/Trainee positions for the City of Fulton.
Posted Date
Dec 12, 2025
Due Date
Jan 30, 2026
Release: Dec 12, 2025
Close: Jan 30, 2026
Examination announcement for Wastewater Treatment Plant / Water Treatment Plant Operator/Trainee positions for the City of Fulton.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →