Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Marion Heights Borough is soliciting sealed bids for stormwater improvements along Brunswick Street between E. Melrose Street and E. Warsaw Street in Northumberland County, Pennsylvania. The work includes installing stormwater inlets and piping, connecting to the existing system, milling and paving, and constructing ADA ramps, with completion required by June 2026. Bids are due by 11:00 AM local time on February 3, 2026, and documents are available through the PennBid portal and from the engineer (Peters Consultants, Inc.).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: 204 LF, installation of 24" HDPE pipe, 4'-5 1/2' deep, excavation, backfill, bedding, trench restoration, temporary pavement, permanent pavement; 95 LF, installation of 18" HDPE pipe, 3'-4' deep, excavation, backfill, bedding, trench restoration; 2 EA, installation of type M inlets, 4' deep, excavation, backfill, bedding, trench restoration, temporary pavement, permanent pavement, seal all joints, connect inlets to piping; 4 EA, installation of ADA ramps and truncated dome pads; 5 EA, installation of type m inlets, 4'-4 1/2' deep, excavation, backfill, bedding, trench restoration, temporary pavement, permanent pavement, seal all joints, connect inlets to piping. See attached files.
Posted Date
Jan 17, 2026
Due Date
Feb 3, 2026
Release: Jan 17, 2026
Close: Feb 3, 2026
Work includes: 204 LF, installation of 24" HDPE pipe, 4'-5 1/2' deep, excavation, backfill, bedding, trench restoration, temporary pavement, permanent pavement; 95 LF, installation of 18" HDPE pipe, 3'-4' deep, excavation, backfill, bedding, trench restoration; 2 EA, installation of type M inlets, 4' deep, excavation, backfill, bedding, trench restoration, temporary pavement, permanent pavement, seal all joints, connect inlets to piping; 4 EA, installation of ADA ramps and truncated dome pads; 5 EA, installation of type m inlets, 4'-4 1/2' deep, excavation, backfill, bedding, trench restoration, temporary pavement, permanent pavement, seal all joints, connect inlets to piping. See attached files.
AvailableMilling, resurfacing, and stormwater improvements, including curb ramp enhancements, for various streets.
Posted Date
Jan 13, 2026
Due Date
Feb 12, 2026
Release: Jan 13, 2026
Close: Feb 12, 2026
Milling, resurfacing, and stormwater improvements, including curb ramp enhancements, for various streets.
AvailableThe 74th street improvements project includes pavement reconstruction, storm sewer installation and water main replacement.
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
Close: Feb 10, 2026
The 74th street improvements project includes pavement reconstruction, storm sewer installation and water main replacement.
AvailableThe project consists of:street improvements. Location 1: approx. 470' x 39' LF of milling and resurfacing curb , installation, culvert replacement, sidewalk replacement, concrete approach installation and curb ramp installation. Location 2: approx. 270' x 39' LF of milling and resurfacing curb installation , reconstruction of a catch basin, sidewalk replacement, concrete approach installation, and curb ramp installation. Location: approx. 1,600" x19" LF of milling and resurfacing, curb installation, sidewalk removal,and replacement, concrete installation, curb inlet installation, culvert replacement, linear grading, and riprap installation. Locations 4: approx. 1030' x35' LF of milling and HMA resurfacing, sidewalk replacement, concrete approach installation, and linear grading. Location 5: approx. 450'x18 LF of milling and resurfacing. Location 6: approx. 1300' x 17' LF of milling and resurfacing, sidewalk replacement, and crosswalk marking installation. Location 7: approx. 1500'x20' LF of milling and resurfacing; location 8: approx. 1140' x18' LF of milling and resurfacing, sidewalk replacement, culvert replacements, curb inlet, installations, riprap installation, and seeding. Location 9: approx. 1660'x19" LF of milling and resurfacing.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Close: Feb 10, 2026
The project consists of:street improvements. Location 1: approx. 470' x 39' LF of milling and resurfacing curb , installation, culvert replacement, sidewalk replacement, concrete approach installation and curb ramp installation. Location 2: approx. 270' x 39' LF of milling and resurfacing curb installation , reconstruction of a catch basin, sidewalk replacement, concrete approach installation, and curb ramp installation. Location: approx. 1,600" x19" LF of milling and resurfacing, curb installation, sidewalk removal,and replacement, concrete installation, curb inlet installation, culvert replacement, linear grading, and riprap installation. Locations 4: approx. 1030' x35' LF of milling and HMA resurfacing, sidewalk replacement, concrete approach installation, and linear grading. Location 5: approx. 450'x18 LF of milling and resurfacing. Location 6: approx. 1300' x 17' LF of milling and resurfacing, sidewalk replacement, and crosswalk marking installation. Location 7: approx. 1500'x20' LF of milling and resurfacing; location 8: approx. 1140' x18' LF of milling and resurfacing, sidewalk replacement, culvert replacements, curb inlet, installations, riprap installation, and seeding. Location 9: approx. 1660'x19" LF of milling and resurfacing.
Available