Summary
Work includes: 204 LF, installation of 24" HDPE pipe, 4'-5 1/2' deep, excavation, backfill, bedding, trench restoration, temporary pavement, permanent pavement; 95 LF, installation of 18" HDPE pipe, 3'-4' deep, excavation, backfill, bedding, trench restoration; 2 EA, installation of type M inlets, 4' deep, excavation, backfill, bedding, trench restoration, temporary pavement, permanent pavement, seal all joints, connect inlets to piping; 4 EA, installation of ADA ramps and truncated dome pads; 5 EA, installation of type m inlets, 4'-4 1/2' deep, excavation, backfill, bedding, trench restoration, temporary pavement, permanent pavement, seal all joints, connect inlets to piping. See attached files.