Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable today—deprioritize and redirect to formal bid.
Coops: Future option: If they open to coops, suggest OneIndiana, HGACBuy, PEPPM, or OMNIA.
Sole Source
Entity: City of Loogootee, IN
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Loogootee's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Clerk-Treasurer
Building Commissioner & Code Enforcement Officer
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Loogootee
The project consists of:street improvements. Location 1: approx. 470' x 39' LF of milling and resurfacing curb , installation, culvert replacement, sidewalk replacement, concrete approach installation and curb ramp installation. Location 2: approx. 270' x 39' LF of milling and resurfacing curb installation , reconstruction of a catch basin, sidewalk replacement, concrete approach installation, and curb ramp installation. Location: approx. 1,600" x19" LF of milling and resurfacing, curb installation, sidewalk removal,and replacement, concrete installation, curb inlet installation, culvert replacement, linear grading, and riprap installation. Locations 4: approx. 1030' x35' LF of milling and HMA resurfacing, sidewalk replacement, concrete approach installation, and linear grading. Location 5: approx. 450'x18 LF of milling and resurfacing. Location 6: approx. 1300' x 17' LF of milling and resurfacing, sidewalk replacement, and crosswalk marking installation. Location 7: approx. 1500'x20' LF of milling and resurfacing; location 8: approx. 1140' x18' LF of milling and resurfacing, sidewalk replacement, culvert replacements, curb inlet, installations, riprap installation, and seeding. Location 9: approx. 1660'x19" LF of milling and resurfacing.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
City of Loogootee
Close: Feb 10, 2026
The project consists of:street improvements. Location 1: approx. 470' x 39' LF of milling and resurfacing curb , installation, culvert replacement, sidewalk replacement, concrete approach installation and curb ramp installation. Location 2: approx. 270' x 39' LF of milling and resurfacing curb installation , reconstruction of a catch basin, sidewalk replacement, concrete approach installation, and curb ramp installation. Location: approx. 1,600" x19" LF of milling and resurfacing, curb installation, sidewalk removal,and replacement, concrete installation, curb inlet installation, culvert replacement, linear grading, and riprap installation. Locations 4: approx. 1030' x35' LF of milling and HMA resurfacing, sidewalk replacement, concrete approach installation, and linear grading. Location 5: approx. 450'x18 LF of milling and resurfacing. Location 6: approx. 1300' x 17' LF of milling and resurfacing, sidewalk replacement, and crosswalk marking installation. Location 7: approx. 1500'x20' LF of milling and resurfacing; location 8: approx. 1140' x18' LF of milling and resurfacing, sidewalk replacement, culvert replacements, curb inlet, installations, riprap installation, and seeding. Location 9: approx. 1660'x19" LF of milling and resurfacing.
AvailableVincennes Utility Services Board
The Division I portion of the project consists of: Installation of approx. 9,150 LF of 12" DI CL 350 water main and appurtenances. Installation of approx. 440 LF of 12" D.I. CL 350 retrained joint water main by uncased bore. Connections to existing 12" DI water mains. New control valve pit and appurtenances.
Posted Date
Aug 13, 2025
Due Date
Sep 10, 2025
Release: Aug 13, 2025
Vincennes Utility Services Board
Close: Sep 10, 2025
The Division I portion of the project consists of: Installation of approx. 9,150 LF of 12" DI CL 350 water main and appurtenances. Installation of approx. 440 LF of 12" D.I. CL 350 retrained joint water main by uncased bore. Connections to existing 12" DI water mains. New control valve pit and appurtenances.
Vincennes Utility Services Board
The division II portion of the project consists of: Installation of approx. 3,430 LF of 8" gravity sewer main and appurtenances. Connections to existing 8" gravity sewer main. Installation of 6" laterals, wyes and clean-outs for connection to existing residences.
Posted Date
Aug 13, 2025
Due Date
Sep 10, 2025
Release: Aug 13, 2025
Vincennes Utility Services Board
Close: Sep 10, 2025
The division II portion of the project consists of: Installation of approx. 3,430 LF of 8" gravity sewer main and appurtenances. Connections to existing 8" gravity sewer main. Installation of 6" laterals, wyes and clean-outs for connection to existing residences.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.