Stonewall Public Works Authority
Special DistrictOK
Posted
Jul 30, 2026
Sep 3, 2026
Southside Sewer Improvements RFP
Remove and replace approx. 1,350 LF 15" PVC; 370 LF 12" PVC; 400 LF 10" PVC 7,020 LF 8" PVC; manholes and appurtenances.
Description: The sewer lift station was originally constructed in 1971 and then moved to its current location in 1991. The Old Village has 31 manholes, seven of which are precast concrete manholes, and 21 are corrugated metal pip (CMP) manholes. The sewer mains were constructed in phases from 1971 to 1991 and consist of a mix of 8" PVC pipe and 8" ductile iron pipe. Base bid – lift station rehabilitation: The contractor shall rehabilitate the old village lift station - including replacement of the pumps and control panels, removal of the settling tank and fences. Additive alternate #1 – sewer main replacement: The contractor shall replace the sewer main between manhole 3 and manhole 12 to improve slopes - including replacements of the sewer main, replacements of manholes 2 and 3, rehabilitation of manhole 12, and demolition of manhole. Additive alternate #2-rehabilitation, repair, or replacement of remaining manholes: The contractor shall rehabilitate, repair, or replace the remaining manholes not included in additive alternate 1 - including the replacement of 5 manholes, the rehabilitation of 6 manholes, and the repair of 7 manholes.
StateAgency · AK, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Stonewall Public Works Authority
Special DistrictOK
Posted
Jul 30, 2026
Sep 3, 2026
Remove and replace approx. 1,350 LF 15" PVC; 370 LF 12" PVC; 400 LF 10" PVC 7,020 LF 8" PVC; manholes and appurtenances.
CityGA
Posted
Aug 3, 2026
Sep 17, 2026
The City of Cumming, operating through Cumming Utilities, is soliciting competitive sealed proposals for construction of the Western Corridor Sanitary Sewer Improvements project. The work includes gravity sanitary sewer, trenchless sewer crossings, an 8-inch force main, a duplex submersible wastewater pumping station, and related site restoration along Reedy Creek and surrounding areas. This is a construction procurement rather than a grant program; proposals are due September 17, 2026, and attendance at a mandatory pre-bid conference on August 20, 2026 is required.
CityMO
Posted
Aug 14, 2026
Sep 24, 2026
Installation of 925 LF of 4" diameter pressure sewer, 6,666 LF of 8" diameter pressure sewer, 1,099 LF of 8" diameter gravity sewer, 1,983 LF of 12" diameter gravity sewer, and 36 LF of 16" diameter gravity sewer, 23 manholes, 258 LF of horizontal directional boring for an 8" pressure sewer, 300 LF of hwy. or road bore for an 8" carrier pipe in a 16" casing pipe, 4" pressure sewer and 8" gravity sewer in a 36" casing pipe, and all other work required for a complete and functioning sewer improvement project.
CityNC
Posted
Aug 10, 2026
Sep 15, 2026
Construction of an 11-gpm sewer grinder pump station and approx 2,315 LF of 1.5” PVC force main to tie in to an existing gravity sewer manhole. The project will also include gravity sewer service to the existing day care facility.
Decision makers connected to this RFP from Alaska Village Safe Water.