Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation and lining of existing sanitary sewer manholes.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This solicitation seeks contractors to perform manhole rehabilitation and lining work for sewer infrastructure in Michigan. The solicitation was published on January 28, 2026, and is scheduled to close on February 12, 2026, at 11:00 AM EST. Detailed specifications and bid documents are available through the MITN / BidNet Direct portal, though access requires user registration.
Posted Date
-
Due Date
Feb 12, 2026
Release: -
Close: Feb 12, 2026
This solicitation seeks contractors to perform manhole rehabilitation and lining work for sewer infrastructure in Michigan. The solicitation was published on January 28, 2026, and is scheduled to close on February 12, 2026, at 11:00 AM EST. Detailed specifications and bid documents are available through the MITN / BidNet Direct portal, though access requires user registration.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking responses from qualified licensed utility contractors for continued efforts to maintain the collections system and to lessen the infiltration of stormwater run-off and ground saturation into the sewer collection system. Work includes, but is not limited to, the following: manhole cleaning of sedimentation and debris. The removal of any loose and unsound material. Performing surface preparation for the lining application. Applying patching products. Manhole lining.
Posted Date
Jan 16, 2026
Due Date
Feb 5, 2026
Release: Jan 16, 2026
Close: Feb 5, 2026
Seeking responses from qualified licensed utility contractors for continued efforts to maintain the collections system and to lessen the infiltration of stormwater run-off and ground saturation into the sewer collection system. Work includes, but is not limited to, the following: manhole cleaning of sedimentation and debris. The removal of any loose and unsound material. Performing surface preparation for the lining application. Applying patching products. Manhole lining.
AvailableRehabilitation of 7,953 LF sanitary sewer ranging 8"-21" in diameter by CIPP Lining, sanitary sewer point repairs, and manhole rehabilitations at various locations within the sanitary sewer. Work includes CIPP lining, grouting, excavation point repairs for sanitary pipe replacement, manhole repairs and adjustments, surface restoration, and miscellaneous related work and appurtenances in accordance with the contract documents.
Posted Date
Jan 16, 2026
Due Date
Feb 18, 2026
Release: Jan 16, 2026
Close: Feb 18, 2026
Rehabilitation of 7,953 LF sanitary sewer ranging 8"-21" in diameter by CIPP Lining, sanitary sewer point repairs, and manhole rehabilitations at various locations within the sanitary sewer. Work includes CIPP lining, grouting, excavation point repairs for sanitary pipe replacement, manhole repairs and adjustments, surface restoration, and miscellaneous related work and appurtenances in accordance with the contract documents.
AvailableProject consist of approx 492 FT of 12" CIPP Sewer Main; 9,640 FT of 8" CIPP Sewer Main.
Posted Date
Jan 27, 2026
Due Date
Feb 20, 2026
Release: Jan 27, 2026
Close: Feb 20, 2026
Project consist of approx 492 FT of 12" CIPP Sewer Main; 9,640 FT of 8" CIPP Sewer Main.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →