Special DistrictWA
Posted
-
Oct 27, 2026
Description: Work includes 4,960 CY dredging - piers 3&4; 12,87 CY dredging - wut.
SpecialDistrict · WA, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Port Of Tacoma.
Adjacent opportunities open for bidding right now.
Special DistrictWA
Posted
-
Oct 27, 2026
Maintenance dredging at Piers 3 & 4 and Washington United Terminals.
CountyMD
Posted
Sep 17, 2026
Oct 28, 2026
Work includes : 1 LS hydraulic dredging, transport, and proper placement of dredged material at the mariner point park dredged material placement site; 1 LS install high visibility fencing and sediment control devices; see attached file.
CityAB
Posted
-
Dec 31, 2026
Application for authorization to install piers, docks, and boat lifts within the Summer Village of Rochon Sands for the year 2026.
Greater Orlando Aviation Authority
Special DistrictFL
Posted
Sep 13, 2026
Oct 23, 2026
Work includes 1 ls safety, security, and maintenance of traffic; 1 ls erosion control and pollution prevention; 11000 CY pond dredging, pumping, and disposal on goaa prop. - e0403b; 8500 CY pond dredging, pumping, and disposal on goaa prop. - e0604; 17000 CY pond dredging, pumping, and disposal on goaa prop. - e0705; 5000 CY pond dredging, pumping, and disposal on goaa prop. - e0806.