Work includes removal of asphalt paved shoulders, all depths 534 SY, removal of guard rail including post, blockouts & hardware 800 LF, excess excavation, lvm, ah 116 CY, geotextile stabilization, type v, non-woven 534 SY, granular material, crushed stone 89 Ton, fine milling of bituminous pavement, all depths 1246 SY, saw cut, full depth 824 LF, guard rail, class a, type 1 600 LF, guard rail, bridge end section, type 4 EA, standard roadside construction signs, less than 10 SF 38 SF, concrete median barrier, precast 2300 SF, remove and reset concrete median barrier, precast 2300 LF, barricades, type iii, double faced 24 LF, impact attenuator, 45 mph, replacement package 2 EA. See attached file.