Dec 1, 2026
Maggie Valley US 276 Pipe Bridge Repair
Pipe Bridge Repair.
Description: Pipe Bridge Repair.
City · NC, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
128 days before RFP
The Board approved staff's application for SRF financing for the US 276 sewer crossing repair, estimated at about $1.5 million excluding the pump-around cost.
Resolution 25-22 Authorizing Town Staff to apply for SRF Grant Funds Sam Cullen, Assistant Town Manager/Town Planner, explained that there are two funds available under the State Revolving Fund (SRF): one offering a $3 million loan with 100% principal forgiveness and another offering a $5 million loan with 100% principal forgiveness. The application…
Board of Aldermen Special Called Meeting
Board meeting · Sep 23, 2025
Board meeting
114 days before RFP
The Board authorized town staff to apply for two SmBIZ grants totaling $1,570,120 for US-276 Double Bridges work, including streambank stabilization, site preparation and the pipe bridge project.
Resolution 25-23: Authorizing Town staff to apply for SmBIZ Grant. (Project 1) Town Manager Vickie Best requested board action on Resolution 25-23, authorizing town staff to apply for the Small Business Grant Project 1. She explained this grant would cover sewer line crossing, stream bank stabilization, and site preparation with flood mitigation measures at…
Board meeting
51 days before RFP
Town staff reported that the 276 crossing project would be bid after environmental engineering, with construction expected after about a month-long bidding process.
Sam Cullen provided a quick management update before adjournment, noting: • Ongoing work on FEMA projects • The new acting FEMA secretary would be calling in remaining projects from Western North Carolina towns within the next month, giving a 15-day deadline for submission. • Three outstanding projects requiring engineering review, with a meeting scheduled…
Town Of Maggie Valley Board Of Aldermen Regular Scheduled Meeting Minutes
Board meeting · Dec 9, 2025
Board meeting
9 days before RFP
The US-276 double bridge project was in design, with truss-bridge pipe-replacement plans received and streambank-restoration design still outstanding.
• Highway 276 double bridge project is in the design stage. Sam and I have received the design plans on the truss bridge for the pipe replacement. We are waiting for the design of the stream bank restoration portion of the project now.
Town Of Maggie Valley Board Of Aldermen Regular Scheduled Meeting Minutes
Board meeting · Jan 20, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (18 days left)
Board of Aldermen Regularly Scheduled (Agenda Setting) Meeting
Board meeting · Oct 7, 2025
Decision makers connected to this RFP from Town of Maggie Valley.
Adjacent opportunities open for bidding right now.
CityNC
Posted
Jan 29, 2026
Dec 1, 2026
Pipe Bridge Repair.
CountyNY
Posted
Feb 13, 2026
Nov 19, 2026
Bridge scour repair.
California Department of Transportation
State AgencyCA
Posted
-
Dec 15, 2026
04-Nap-29-42.8 *** NAPA COUNTY NEAR CALISTOGA AT NO NAME CREEK BRIDGE
CountyAL
Posted
Oct 30, 2026
Nov 18, 2026
Perform various bridge maintenance and repairs on bridges, bridge culverts, and roadway culverts (cross drains). repairs on bridges, bridge culverts, and roadway culverts (cross drains) located in County. The types of work include but are not limited to; pile encasements/encasement extensions, the removal and replacements of precast bridge components, pile driving, placement of pre-cast box culvert components, placement of rip rap to prevent scour and provide channel protection, cross drain concrete lining, and minor structure concrete (i.e. cross drain inlet/outlet concrete footers, concrete slope paving, minor cross drain headwalls, culvert parapet wall extensions, etc.).