Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of Dam Replacements project, replacement of three motor-operated slide gates spanning. Replace (3) existing carbon steel slide gates and mounting components with new fabricated stainless steel slide gates and modified mounting mechanisms. The new stainless steel slide gate dimensions (3 total) shall be appro 12' (W) x 4' (H) x 8" (D) each.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work tasks will generally involve partial removal of the concrete core wall; partial removal of the earthen embankment; removal of all dam appurtenances including the concrete spillway, gatehouse, concrete wellhouse, and associated drain pipes; removal of accumulated sediment; stream channel restoration; removal of the culvert remnants downstream of the dam; and site restoration (See Attachment A).
Posted Date
Jan 5, 2026
Due Date
Feb 17, 2026
Release: Jan 5, 2026
Close: Feb 17, 2026
Work tasks will generally involve partial removal of the concrete core wall; partial removal of the earthen embankment; removal of all dam appurtenances including the concrete spillway, gatehouse, concrete wellhouse, and associated drain pipes; removal of accumulated sediment; stream channel restoration; removal of the culvert remnants downstream of the dam; and site restoration (See Attachment A).
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for construction services for the partial removal of the Springfield Reservoir Dam, including its appurtenances and accumulated sediment, and stream channel restoration.
Posted Date
Jan 5, 2026
Due Date
Feb 17, 2026
Release: Jan 5, 2026
Close: Feb 17, 2026
This RFP is for construction services for the partial removal of the Springfield Reservoir Dam, including its appurtenances and accumulated sediment, and stream channel restoration.
AvailableCompetitive sealed bids are requested for construction services for the Lisbon Channel Improvements Arkansas Channel to Southern Blvd.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
Competitive sealed bids are requested for construction services for the Lisbon Channel Improvements Arkansas Channel to Southern Blvd.
AvailableWork includes: construct new primary spillway structure, remove existing spillway, construct auxiliary spillway at location of existing spillway, regrade downstream channel, install SCADA system. Major work items include: install sheetpile cofferdam, construct concrete gated spillway structure, dredging and channel grading, dam demolition, construct auxiliary spillway, install pre manufactured pedestrian bridge, install SCADA instrumentation system, and site restoration.
Posted Date
Jan 24, 2026
Due Date
Feb 17, 2026
Release: Jan 24, 2026
Close: Feb 17, 2026
Work includes: construct new primary spillway structure, remove existing spillway, construct auxiliary spillway at location of existing spillway, regrade downstream channel, install SCADA system. Major work items include: install sheetpile cofferdam, construct concrete gated spillway structure, dredging and channel grading, dam demolition, construct auxiliary spillway, install pre manufactured pedestrian bridge, install SCADA instrumentation system, and site restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.