CityAZ
Posted
Sep 24, 2026
Oct 29, 2026
Pavement Replacement North End Phase II RFP
Work consists of removal of existing 72,554 SY of asphalt pavement, base course as needed, and sections of sidewalk and curb. Installation of approx 1,787 LF of new 6" pvc c900 water main, including new service connections and fire hydrants. Construction of new pavement consisting of a structural section with 3" of asphalt concrete over existing or new aggregate base course (abc) as needed. All sidewalk and ramps will be replaced to comply with ADA standards.
