Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Medford
ADA ramp improvement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Tigard
The project generally consists of the following: a. Temporary signage, protection, and traffic control b. Temporary erosion and sediment control c. Construction of concrete curbs, ramps and pedestrian facilities. D. Construction of asphalt concrete pavement repair including aggregate placement. E. Installation and relocation of permanent signage and striping. F. Removal of existing flashing pedestrian crossing beacons. G. Installation of new flashing pedestrian crossing beacons and appurtenances. H. Performance of additional and incidental work as called for by the specifications and plans.
Posted Date
-
Due Date
Dec 2, 2025
Release: -
City of Tigard
Close: Dec 2, 2025
The project generally consists of the following: a. Temporary signage, protection, and traffic control b. Temporary erosion and sediment control c. Construction of concrete curbs, ramps and pedestrian facilities. D. Construction of asphalt concrete pavement repair including aggregate placement. E. Installation and relocation of permanent signage and striping. F. Removal of existing flashing pedestrian crossing beacons. G. Installation of new flashing pedestrian crossing beacons and appurtenances. H. Performance of additional and incidental work as called for by the specifications and plans.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Tigard
The project generally consists of the following: a. Temporary signage, protection, and traffic control b. Temporary erosion and sediment control c. Construction of concrete curbs, ramps and pedestrian facilities. D. Construction of asphalt concrete pavement repair including aggregate placement. E. Installation and relocation of permanent signage and striping. F. Removal of existing flashing pedestrian crossing beacons. G. Installation of new flashing pedestrian crossing beacons and appurtenances. H. Performance of additional and incidental work as called for by the specifications and plans.
Posted Date
-
Due Date
Dec 2, 2025
Release: -
City of Tigard
Close: Dec 2, 2025
The project generally consists of the following: a. Temporary signage, protection, and traffic control b. Temporary erosion and sediment control c. Construction of concrete curbs, ramps and pedestrian facilities. D. Construction of asphalt concrete pavement repair including aggregate placement. E. Installation and relocation of permanent signage and striping. F. Removal of existing flashing pedestrian crossing beacons. G. Installation of new flashing pedestrian crossing beacons and appurtenances. H. Performance of additional and incidental work as called for by the specifications and plans.
AvailableCity of Independence
The City of Independence, KS is seeking bids for pavement patching, curb and gutter patching, sidewalk replacement, and sidewalk ADA ramp replacement. The contract involves excavation, compacted granular stone, sawcutting, and cast-in-place concrete. Three contracts will be awarded for water/sewer, street department, and sidewalk repairs.
Posted Date
-
Due Date
Dec 18, 2025
City of Independence
Close: Dec 18, 2025
The City of Independence, KS is seeking bids for pavement patching, curb and gutter patching, sidewalk replacement, and sidewalk ADA ramp replacement. The contract involves excavation, compacted granular stone, sawcutting, and cast-in-place concrete. Three contracts will be awarded for water/sewer, street department, and sidewalk repairs.
AvailableCity of Independence
The City of Independence, KS is seeking bids for pavement patching, curb and gutter patching, sidewalk replacement, and sidewalk ADA ramp replacement. The contract involves excavation, compacted granular stone, sawcutting, and cast-in-place concrete. Three contracts will be awarded for water/sewer, street department, and sidewalk repairs.
Posted Date
-
Due Date
Dec 18, 2025
City of Independence
Close: Dec 18, 2025
The City of Independence, KS is seeking bids for pavement patching, curb and gutter patching, sidewalk replacement, and sidewalk ADA ramp replacement. The contract involves excavation, compacted granular stone, sawcutting, and cast-in-place concrete. Three contracts will be awarded for water/sewer, street department, and sidewalk repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →