Posted
Oct 7, 2026
Nov 4, 2026
West Hickman Locker Room Renovation RFP
West hickman locker room renovation.
Description: Metro Vancouver is requesting proposals for construction work to renovate the men’s locker room at Lulu Island WWTP. The work is detailed in Appendix A of the solicitation. Proposals must be submitted online through the buyer’s procurement portal.
County · BC, CA
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Metro Vancouver Regional District.
Adjacent opportunities open for bidding right now.
Posted
Oct 7, 2026
Nov 4, 2026
West hickman locker room renovation.
CityCA
Posted
Sep 25, 2026
Dec 4, 2026
Provide architectural and engineering design services for the renovation of the locker room facilities; grout in the shower and floor tile has eroded, creating sanitation concerns and increasing the potential for water intrusion beneath the flooring. The existing rubber flooring has begun to bubble and lift due to prolonged moisture exposure, presenting both a safety hazard and an ongoing maintenance issue. Ventilation in the locker rooms is inadequate, contributing to excess moisture. The existing lockers and benches are original to the facility and are at the end of their service life.
Gloucester City Public Schools
School DistrictNJ
Posted
-
Nov 12, 2026
The Gloucester City Board of Education seeks a contractor to gut and renovate the existing boys’ and girls’ locker rooms at Gloucester City High School, including plumbing relocation and interior finish work. The contractor will handle demolition, construction, and associated trades; the owner will perform asbestos abatement and supply and install the lockers and benches. Optional work would convert a science lab into a trainer’s room and reconfigure the existing trainer’s room as office space, and sealed physical bids are due November 12, 2026, at 2:00 p.m., with mobilization expected in January 2027 and completion targeted for early June 2027.
Higher EducationOK
Posted
Oct 21, 2026
Nov 16, 2026
Fabricate and install sixteen (16) new custom athletic team lockers with logo in the women's basketball locker room inside the kerr activities center (the dome)