Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Lost Bridge Village Water And Sewer Improvement District 12
Rehabilitating three (3) sewer pump stations. Rehabilitation is to include the complete replacement of each pump station, wet well protective liner installation, and the installation of a small retaining wall at one pump station. Minor sitework/grading may be required.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Pebble Beach Community Services District
Work consists of rehabilitating a wastewater pump station.
Posted Date
Oct 13, 2025
Due Date
Nov 18, 2025
Release: Oct 13, 2025
Pebble Beach Community Services District
Close: Nov 18, 2025
Work consists of rehabilitating a wastewater pump station.
Orange Co Sanitation District
Seeking engineering services for pump station rehabilitation.
Posted Date
Oct 28, 2025
Due Date
Dec 9, 2025
Release: Oct 28, 2025
Orange Co Sanitation District
Close: Dec 9, 2025
Seeking engineering services for pump station rehabilitation.
AvailableYpsilanti Community Utilities Authority
The project consists of sealing the masonry crack in the wall of the Bridge Road Pump Station, removing the existing retaining wall, restoring the ground slope, installing underdrain around the storage tank and repairing the concrete foundation.
Posted Date
Nov 13, 2025
Due Date
Dec 3, 2025
Release: Nov 13, 2025
Ypsilanti Community Utilities Authority
Close: Dec 3, 2025
The project consists of sealing the masonry crack in the wall of the Bridge Road Pump Station, removing the existing retaining wall, restoring the ground slope, installing underdrain around the storage tank and repairing the concrete foundation.
AvailableCity of Everglades
Work includes rehabilitation of existing master pump station.
Posted Date
Nov 10, 2025
Due Date
Dec 16, 2025
Release: Nov 10, 2025
City of Everglades
Close: Dec 16, 2025
Work includes rehabilitation of existing master pump station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis