Summary
Work includes 570.3703703703704 CY earth excavation; 300 CY borrow; 831.1111111111111 sy removal of bituminous pavement; 20 LF cut bituminous concrete pavement; 875 LF sediment control filter fabric fence; 14,875 SF chip seal; 99.16666666666667 gal material for tack coat; 30 CY modified riprap; 875 LF precast concrete curbing; 805 SY concrete sidewalk; 345. 679012345679 CY furnish and place topsoil; 100 CY stockpiling and placing topsoi; 1 LS irrigation; 1 EA bike repair station (remove and relocate); 2,604 LF trenching and backfilling; 12 EA light standard foundation; 2 EA traffic control foundation - controller ty iv. See attached file.