Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Loganville seeks bids for the replacement and rehabilitation of storm sewers, requiring materials, labor, and equipment. Bidders must provide proof of insurance and comply with E-Verify and relevant laws.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2025 sewer rehabilitation project.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
2025 sewer rehabilitation project.
AvailableWork includes rehabilitation of three (3) streets, the installation of new sanitary sewer mains, and storm drain improvements, rehabilitation shall include, but is not limited to, the removal and replacement of pavement section, driveways, curb and gutter, sanitary sewer manholes and pipe, select storm drain structures and pipe, dewatering, landscaping, pavement striping and signage, provisions for traffic control.
Posted Date
Jan 29, 2026
Due Date
Feb 19, 2026
Release: Jan 29, 2026
Close: Feb 19, 2026
Work includes rehabilitation of three (3) streets, the installation of new sanitary sewer mains, and storm drain improvements, rehabilitation shall include, but is not limited to, the removal and replacement of pavement section, driveways, curb and gutter, sanitary sewer manholes and pipe, select storm drain structures and pipe, dewatering, landscaping, pavement striping and signage, provisions for traffic control.
AvailableThe project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Feb 5, 2026
Release: Jan 13, 2026
Close: Feb 5, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailableWork consists of: Removing and disposing of the top 2' of a 4' X 6' box culvert, and pulverizing the bottom. Installing a 24" diameter C-900 storm sewer. Excavating, handling, transporting, and disposing of soils contaminated with TCE, SVOCs, and arsenic. Restoring pavement with new base and HMA pavement.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
Work consists of: Removing and disposing of the top 2' of a 4' X 6' box culvert, and pulverizing the bottom. Installing a 24" diameter C-900 storm sewer. Excavating, handling, transporting, and disposing of soils contaminated with TCE, SVOCs, and arsenic. Restoring pavement with new base and HMA pavement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis