Closing soon

Log Adjustment along West River Shoreline Trail (Request for Quote)

Description: Work include adjustment of 9 existing cabled logs along the west river shoreline trail includes adjustment of the existing logs from the top-of-bank along the west river shoreline enhancement project site. This will include 9 existing logs in the highlighted section of figure; no vegetation clearing will be allowed; repositioned cabled logs can be anchored using materials and methods per the design drawings (see figure e), or with alternative materials and methods approved by OPRHP in advance of installation; additional logs washed into the shoreline area where logs are being repositioned should be laid unachored behind (landward) and parallel to the newly repostioned and anchored logs.

Released
Sep 4, 2026
Closes
Sep 28, 2026(10 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts