Retrieving RFP details
Release
Close
Seminole County
Construction of a new sewer force main and reclaimed water main. The project involves the furnishing and installation of a new force main and reclaimed water main, which will be installed through open cut along the easement. The force main will be extended using directional drilling techniques. The existing gravity sewer main lacks the capacity to accommodate future flows from upcoming developments. Asphalt Removal and Replacement 1790 sy, Concrete Driveway and Sidewalk Removal and Replacement 75 sy, Concrete Curb and Gutter Replacement 26 lf, Landscape Restoration, Sodding and Hedges 41859 sf, 10" PVC Force Main - Open Cut 1989 lf, 10" HDPE Force Main - HDD 1797 lf, 12" PVC Reclaimed Water - Open Cut 1504, 12" HDPE Reclaimed Water - HDD 212 lf, Connection to Existing Wet Well - Lockwood Blvd 1 ea. See outside link or attached files.
Lockwood Blvd Force Main and Reclaim Water Main Construction
zip
Washington Suburban Sanitary Commission (WSSC)
Work includes installation of approx 27 LF of new 8" water main and 3,851 LF of new 16" water main, and the replacement of approx 237 LF of 8" water main, 8 LF of 10" water main and 43 LF of 16" water main. The contract also includes installation of approx 2,254 LF of water house connections; replace existing main with 8" dip; furnish 8" DIP and fittings; install 4" dip for blow-off leads; install 6" DIP fire hydrant leads; replace existing 3/4 and 1" water house connections with 1" water house connection; furnish 1" copper pipe and fittings for water house connections with single inside meter. See outside link.
City of Prairieburg
Work in general consists of the installation of approx. 980 LF of 4" PVC water main with related appurtenances and surface repair.
Clermont County
Construction of approx. 3,656 LF of 12", 45 LF of 8" and 195 LF of 6" DI water main to replace the existing 8" cast iron water main and appurtenances.
Release
Oct 06, 2025
Close
Nov 05, 2025