CityUT
Aug 27, 2026
Closes
Sep 9, 2026
Peterson Industrial Depot - Water Infrastructure Pothole Location Project
Pothole and positive identification of existing pavement thickness and conditions, and for the identification of pipeline size, type, condition and depth at approximately 20 "cross" pipe line locations, 25 "tee" pothole locations and 3 single pipeline locations.