Summary
Construction of loading docks improvements. Work include Demolition of asphalt concrete pavement surface. Demolition of a reinforced concrete staircase with metal handrailing. Removal of wood, laminated rubber, and molded rubber bumpers. Demolition and removal of post-indicator valve (PIV) assemblies and associated piping and appurtenances. Installation of 8" Thick, Steel-Reinforced Portland Cement Concrete Pavement. Installation of reinforced concrete staircase with metal handrailing. Installation of Pre-Fabricated Metal Staircase. Installation of molded rubber bumpers or laminated rubber bumpers. Installation of post-indicator valve assemblies