Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Streetscape Improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 36,006 SF of walk removal; 3,115 LF of curb removal; 76 CY of excavation; 398 SY of subgrade compaction; 90 LF of fencing; 31,600 SF of 4" concrete walk; 1,008 SF of 6" concrete walk; erosion control; 117 CY of asphalt concrete base; 3,045 LF of curb, type 6; 3,028 LF of 4" unclassified pipe underdrains; 432 LF 3" conduit by jack and bore. See outside link.
Posted Date
Jul 28, 2025
Due Date
Jan 23, 2026
Release: Jul 28, 2025
Close: Jan 23, 2026
Work includes 36,006 SF of walk removal; 3,115 LF of curb removal; 76 CY of excavation; 398 SY of subgrade compaction; 90 LF of fencing; 31,600 SF of 4" concrete walk; 1,008 SF of 6" concrete walk; erosion control; 117 CY of asphalt concrete base; 3,045 LF of curb, type 6; 3,028 LF of 4" unclassified pipe underdrains; 432 LF 3" conduit by jack and bore. See outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 15, 2026
Close: Feb 12, 2026
Roadway improvements
AvailableWork includes 36,006 SF of walk removal; 3,115' of curb removal; 76 CY of excavation; 398 SY of subgrade compaction; 90' of fencing; 31,600 SF of 4" concrete walk; 1,008 SF of 6" concrete walk; erosion control; 117 CY of asphalt concrete base; 3,045' of curb, type 6; 3,028' of 4" unclassified pipe underdrains; See outside link.
Posted Date
Dec 19, 2025
Due Date
Jan 23, 2026
Release: Dec 19, 2025
Close: Jan 23, 2026
Work includes 36,006 SF of walk removal; 3,115' of curb removal; 76 CY of excavation; 398 SY of subgrade compaction; 90' of fencing; 31,600 SF of 4" concrete walk; 1,008 SF of 6" concrete walk; erosion control; 117 CY of asphalt concrete base; 3,045' of curb, type 6; 3,028' of 4" unclassified pipe underdrains; See outside link.
AvailableThe Town of Eagle, Colorado is soliciting bids for streetscape and utility improvements on Capitol Street. The project is expected to include upgrades to pedestrian and streetscape elements along with utility replacements or improvements. Bids are due February 13, 2026 at 12:00 PM MST.
Posted Date
Jan 12, 2026
Due Date
Feb 13, 2026
Release: Jan 12, 2026
Close: Feb 13, 2026
The Town of Eagle, Colorado is soliciting bids for streetscape and utility improvements on Capitol Street. The project is expected to include upgrades to pedestrian and streetscape elements along with utility replacements or improvements. Bids are due February 13, 2026 at 12:00 PM MST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →