Special DistrictTX
Posted
-
Oct 8, 2026
LNVA - Simon Canal at FM 1663 & Olede Canal at FM 1410 Crossing Improvements
Provide construction of two (2) canal crossing improvements. Work generally consists of installing four (4) - 60" hobas pipe and constructing a concrete headwall. Work generally consists of installing three (3) - 60" hobas pipe and constructing a concrete check structure. See attached file.