Palm Beach County Water Utilities Department
Special DistrictFL
Posted
May 24, 2026
Nov 12, 2026
Western Region Wastewater Treatment Facility Phase 2 Electrical Building & Resiliency Improvements Progressive Design-Build
Design-Build: provide design-build services related to permitting, design, construction, commissioning, training, and handover of the following major project elements: an elevated new main electrical building and a new deep injection well (diw) electrical buildings with new equipment, an elevated new outdoor enclosure for diesel emergency generators, demolition of the existing operation/electrical building and existing main generator building, conversion of existing diw mcc building to a storage building, stormwater enhancements of the existing site, existing powerline relocation or underground installation, electrical, instrumentation and controls improvements, process improvements.