Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1 LS Remove Existing Bridge, Pilings and Logs. 1 LS Furnish and Install New Bridge System. 780 LF 8" Steel Piling 5 CY Excavation Channel and Pond 450 SF 6" 8" Concrete Walk. 120 LF Flotation Silt Curtain Type Moving Water. 1 LS Turf Establishment The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Requesting quotations from fully qualified and licensed engineering firms to provide a structural conditional assessment of a pedestrian timber bridge.
Posted Date
Dec 23, 2025
Due Date
Jan 14, 2026
Release: Dec 23, 2025
Close: Jan 14, 2026
Requesting quotations from fully qualified and licensed engineering firms to provide a structural conditional assessment of a pedestrian timber bridge.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work to be performed shall include, but not be limited to: storm drain lateral relocation, construction of the bosque pedestrian-bike bridge, construction of median curb and gutter, striping, and other items.
Posted Date
Nov 26, 2025
Due Date
Jan 29, 2026
Release: Nov 26, 2025
Close: Jan 29, 2026
The work to be performed shall include, but not be limited to: storm drain lateral relocation, construction of the bosque pedestrian-bike bridge, construction of median curb and gutter, striping, and other items.
AvailablePedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailablePedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →