Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Irvine
The work to be performed shall include, but not be limited to: storm drain lateral relocation, construction of the bosque pedestrian-bike bridge, construction of median curb and gutter, striping, and other items
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Warren
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
City of Warren
Close: Dec 12, 2025
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Yarmouth Police Department
Chase Brook Park restoration and pedestrian bridge project. Removal of brick walk way, trees, vegetation, installation of timber piles for pedestrian bridge, construction of pedestrian bridge, vegetative planting, coir logs for bank stabilization, site grading park walkways, installation of benches, picnic tables, & more
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Yarmouth Police Department
Close: Dec 19, 2025
Chase Brook Park restoration and pedestrian bridge project. Removal of brick walk way, trees, vegetation, installation of timber piles for pedestrian bridge, construction of pedestrian bridge, vegetative planting, coir logs for bank stabilization, site grading park walkways, installation of benches, picnic tables, & more
AvailableTown of Yarmouth
The Town of Yarmouth (Department of Public Works) is soliciting contractors to perform Chase Brook Park restoration and construct a pedestrian bridge, including removal of existing brick walkways and vegetation, site grading, timber pile installation for the bridge, planting, installation of benches/picnic tables, and bank stabilization using coir logs. The solicitation is an open market public works procurement; bidders should be prepared to submit technical and cost proposals and demonstrate experience in park restoration, landscape, and bridge construction.
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Town of Yarmouth
Close: Dec 19, 2025
The Town of Yarmouth (Department of Public Works) is soliciting contractors to perform Chase Brook Park restoration and construct a pedestrian bridge, including removal of existing brick walkways and vegetation, site grading, timber pile installation for the bridge, planting, installation of benches/picnic tables, and bank stabilization using coir logs. The solicitation is an open market public works procurement; bidders should be prepared to submit technical and cost proposals and demonstrate experience in park restoration, landscape, and bridge construction.
AvailableOld Bridge Township Public Schools
Pedestrian bridge repairs.
Posted Date
Oct 14, 2025
Due Date
Dec 12, 2025
Release: Oct 14, 2025
Old Bridge Township Public Schools
Close: Dec 12, 2025
Pedestrian bridge repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →