Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rehabilitation services for seven sanitary sewer lift stations, including demolition, new pump installation, piping, wet well lining, and electrical modifications.
Posted Date
Nov 28, 2025
Due Date
Jan 29, 2026
Release: Nov 28, 2025
Close: Jan 29, 2026
Rehabilitation services for seven sanitary sewer lift stations, including demolition, new pump installation, piping, wet well lining, and electrical modifications.
AvailableWork includes to perform certain renovations, modifications and upgrades to sewage lift stations, piping and pump replacement; bypass pumping; replacing valves and discharge piping; installation of bypass assemblies; construction of valve vaults; installation of guide rails for pump systems; installation of water services at designated stations; replacement of existing wet well tops; installation of scada controls at designated lift stations; along with other associated site work and restoration of all disturbed facilities, existing electrical controls will be removed and replace with new.
Posted Date
Nov 7, 2025
Due Date
Feb 3, 2026
Release: Nov 7, 2025
Close: Feb 3, 2026
Work includes to perform certain renovations, modifications and upgrades to sewage lift stations, piping and pump replacement; bypass pumping; replacing valves and discharge piping; installation of bypass assemblies; construction of valve vaults; installation of guide rails for pump systems; installation of water services at designated stations; replacement of existing wet well tops; installation of scada controls at designated lift stations; along with other associated site work and restoration of all disturbed facilities, existing electrical controls will be removed and replace with new.
Work includes approx 1 LS lift station rehabilitation; 1 LS SCADA instrumentation, metering equipment, installation and training; 1 EA project sign.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
Work includes approx 1 LS lift station rehabilitation; 1 LS SCADA instrumentation, metering equipment, installation and training; 1 EA project sign.
AvailableWork includes rehabilitation of a sanitary sewer lift station.
Posted Date
Jan 15, 2026
Due Date
Feb 10, 2026
Release: Jan 15, 2026
Close: Feb 10, 2026
Work includes rehabilitation of a sanitary sewer lift station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis