Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of St. Cloud, Minnesota is soliciting proposals from qualified consultant engineering firms to provide professional design services for the Improvements and Rehabilitation of Wastewater Lift Station No. 51, also referred to as the Main Lift Station (MLS). The selected Consultant will evaluate existing facilities, develop improvements, prepare design documents, provide probable construction cost opinions, and support the bidding process.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of emergency lift station improvements.
Posted Date
Jan 12, 2026
Due Date
Feb 17, 2026
Release: Jan 12, 2026
Close: Feb 17, 2026
Project consists of emergency lift station improvements.
AvailableThis RFP is for the replacement and rehabilitation of Lift Station 13, including all related accessories, materials, labor, and equipment.
Posted Date
-
Due Date
Mar 31, 2026
Release: -
Close: Mar 31, 2026
This RFP is for the replacement and rehabilitation of Lift Station 13, including all related accessories, materials, labor, and equipment.
AvailableRelease: -
Close: Feb 4, 2026
Proposed lift station 4-7 improvements.
AvailableThe work consists of approx. the construction of a new lift station to replace the existing station, including the construction of a new wet well, gravity sewer, force main, generator and electrical building, standby power system, and demolition of the existing lift station. The work also includes site work improvements, HVAC, electrical, and other ancillary work required to accomplish the modifications. See outside link for more details.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
The work consists of approx. the construction of a new lift station to replace the existing station, including the construction of a new wet well, gravity sewer, force main, generator and electrical building, standby power system, and demolition of the existing lift station. The work also includes site work improvements, HVAC, electrical, and other ancillary work required to accomplish the modifications. See outside link for more details.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis