City of Daytona Beach
Project includes the rehabilitation of the city's lift station. Work includes 4" bypass pumping 0 - 300 GPM (includes 100' of temporary piping set-up & monitoring Device) (4" connection) 1 LS, demo & disposal of old piping,valve vault, debris, and old Smith & Loveless L/S., installation of 2' wetwell extension, lining of wet well using epoxy-based lining (Raven 405) 440 SF, lift station rehab complete, electrical, connect to existing forcemain 1 LS, 8" thick driveway and apron 66 SY, see outside link.
Lift Station No
68 Rehabilitation (ITB)
Release
Dec 18, 2024
Close
Jan 22, 2025