CityMN
Posted
Oct 13, 2026
Nov 19, 2026
Lift Station #53 Rehabilitation RFP
Lift station #53 rehabilitation.
Description: Project includes the rehabilitation of the city's lift station. Work includes removal of existing hardware, water service, gravity sewer, electrical equipment and installation of new pumps, rails, pipes, USEMCO "top vault" system, controls, gravity sewer, wet well extension riser, lining wet well and top slab, new discharge piping and electrical equipment.
City · FL, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Daytona Beach.
These related opportunities are still open for bidding.
CityMN
Posted
Oct 13, 2026
Nov 19, 2026
Lift station #53 rehabilitation.
CityFL
Posted
Nov 2, 2026
Dec 2, 2026
Worl includes approx 434 SY milling and resurfacing; 1 LS furnish and install precast concrete wet well; 99 LF of 12" PVC gravity sewer.
CityTX
Posted
Nov 11, 2026
Dec 10, 2026
Work includes replace the deteriorating lift station with a new wet well, valve vault, pumping equipment, structural components, yard piping, site grading, paving improvements, upgrading electrical service, duct banks, lighting, instrumentation, and SCADA controls.
CityFL
Posted
Nov 3, 2026
Dec 8, 2026
The Project consists of but not limited to remove existing can station and replace with a traditional lift station; upgrade lift station to comply with 500-year flood plain requirements; improve property aesthetics; provide better access to the station; furnish all tools, equipment, materials, and labor required to complete the project.