Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the rehabilitation of the city's lift station. Work includes removal of existing hardware, water service, gravity sewer, electrical equipment and installation of new pumps, rails, pipes, USEMCO "top vault" system, controls, gravity sewer, wet well extension riser, lining wet well and top slab, new discharge piping and electrical equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Work includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
AvailableSeeking professional engineering services for the rehabilitation of an existing wastewater lift station.
Posted Date
Dec 11, 2025
Due Date
Jan 20, 2026
Release: Dec 11, 2025
Close: Jan 20, 2026
Seeking professional engineering services for the rehabilitation of an existing wastewater lift station.
AvailableThe Town of Orange Park, Florida is soliciting sealed bids for the Reed Street Lift Station Rehabilitation project, which includes relining the existing wet well, replacing pumps and appurtenances, electrical/control improvements, and associated site work. Bids are due January 15, 2026 at 11:00 a.m. local time at the Town Manager’s office.
Posted Date
-
Due Date
Jan 15, 2026
Release: -
Close: Jan 15, 2026
The Town of Orange Park, Florida is soliciting sealed bids for the Reed Street Lift Station Rehabilitation project, which includes relining the existing wet well, replacing pumps and appurtenances, electrical/control improvements, and associated site work. Bids are due January 15, 2026 at 11:00 a.m. local time at the Town Manager’s office.
AvailableRFP for the construction of Wastewater Collection System Improvements, Contract 3 - Lift Station #3 & #4 Rehabilitation.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
RFP for the construction of Wastewater Collection System Improvements, Contract 3 - Lift Station #3 & #4 Rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis