Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Longboat Key
The Town is soliciting proposals from qualified and experienced contractors to perform the necessary replacements of electrical panels at eleven (11) sewer lift stations affected by Hurricane Helene. The scope of work includes assessment and replacement of all sewer lift station electrical panels affected by Hurricane storm surge.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Benton Harbor
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
City of Benton Harbor
Close: Dec 18, 2025
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
AvailableCity of Hudsonville
Work include the replacement of the highland lift station. Work includes the demolition of the existing lift station and construction of a submersible duplex lift station including a wet well, valve chamber, sanitary sewer, pumps, valve and piping, control panel, electrical, driveway and trail replacement, grass restoration, and all associated appurtenances.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
City of Hudsonville
Close: Dec 17, 2025
Work include the replacement of the highland lift station. Work includes the demolition of the existing lift station and construction of a submersible duplex lift station including a wet well, valve chamber, sanitary sewer, pumps, valve and piping, control panel, electrical, driveway and trail replacement, grass restoration, and all associated appurtenances.
AvailableCity of Long Beach
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
Posted Date
Oct 22, 2025
Due Date
Nov 25, 2025
Release: Oct 22, 2025
City of Long Beach
Close: Nov 25, 2025
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
AvailableCity of La Harpe
Remove and replace three (3) vacuum prime pump station including controls, piping, and appurtenances. Corrosion protective coating of existing wet wells. Install new 5' diameter wet well and vacuum prime lift station. Replace two (2) submersible pumps, controls, and electrical at primary lift station.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
City of La Harpe
Close: Dec 16, 2025
Remove and replace three (3) vacuum prime pump station including controls, piping, and appurtenances. Corrosion protective coating of existing wet wells. Install new 5' diameter wet well and vacuum prime lift station. Replace two (2) submersible pumps, controls, and electrical at primary lift station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis